

Productivity-driven features within the upgraded office solution include an ability to connect to the newest version of Topcon’s Sitelink3D site monitoring and management system. Additionally, there are improvements in data handling for large and complex 3D projects.
#Topcon 3d office newest version software#
With that in mind, this solution provides compatible, comprehensive, connected answers to many of those shared issues.”Įnhancements in the site version of the software have been made to improve 3D model support, reporting, and interactivity in working directly on a visual map.

“We’ve long recognised that many of the basic needs and challenges of today’s survey and construction disciplines are similar. “It does so by tapping the power of integrated solutions to provide end-to-end workflows, superior data exchange and a far better level of collaboration. “Our suite, made up of field software, cloud services, tightly integrated office software and third-party integrations, is a key component of our digital ecosystem, all designed to enhance productivity in the field while helping the office efficiently manage the project dataset.

“The push to ramp up production levels and increase efficiency, while operating profitably, has never been greater,” says Alok Srivastava, senior director, product management. The software is also designed to improve accuracy while efficiently managing data and collaboration - in real-time - with the project team. Topcon has introduced Topcon Magnet 7, the latest release of its site, cloud and office software suite for construction and survey professionals.Īccording to Topcon, the new version is designed to utilise the strength that cloud-based connectivity can play in streamlining workflows through GNSS receivers, total stations, and other positioning tools and instruments, and address common needs to increase productivity, and efficiency across the construction site. Topcon Magnet 7 designed to enhance digital connectivity between the office and construction site
